Implementing a risk management system based on Oracle Primavera Risk Analysis to increase effectiveness of capital project management

Find a solution
LUKOIL Nizhnevolzhskneft
Oil and Gas
Russia
2007
Implementing a risk management system based on Oracle Primavera Risk Analysis to increase effectiveness of capital project management

Tasks

The key objective of implementing a risk management system based on Oracle Primavera Risk Analysis is to increase effectiveness of capital project management in the "Building infrastructure for the Kuvykin field" project office  by:

  • consolidating information on project risks and their impact on project progress 
  • determining the most likely completion dates of the project 
  • developing alternative project scenarios to minimize impact of risks and determining parameters for these scenarios

ITPS group implemented a risk management information system and ensured integration between the system and an existing calendar planning and control system based on Oracle Primavera P6. The system was implemented at the LUKOIL INFORM data center to be easily accessed from anywhere and requires only minimum administration effort. Users can access the integrated systems from any point via Internet connection. 

During the project, ITPS delivered training for customer personnel and provided a complete set of operation documents as listed in the specification.


Result

The risk management system based on Oracle Primavera Risk Analysis which has been in commercial operation since January 2016 enables the project office team to:

  1. Effectively plan capital projects using advanced IT tools and methods based on the best practices of the oil and gas industry
  2. Use advanced IT tools to increase quality and efficiency of decision-making and effectively distribute managerial information during capital project implementation
  3. Reduce time spent on informational exchanges between the calendar planning and control system based on Oracle Primavera P6 and risk management system based on Oracle Primavera Risk Analysis