LUKOIL
In 2013-2014 Parma-Telecom (ITPS) carried out the integration of SAP ERP system and the project design documentation control system (PDD CS) based on the platform OpenText Content Server 10.0 within the scope of the project “The Interface of Access to Project Design Documentation” (hereinafter PDD) in the plant maintenance (hereinafter PM) objects for LUKOIL Mid-East Ltd.
The project was carried out in several stages:
The consultants of Parma-Telecom (ITPS) had to procure a prompt access to project design documentation in SAP ERP functional locations.
The following tasks were completed in the course of the project:
Some 425 documents in the form of electronic links to 13,021 Functional Locations were downloaded into the PM objects (Functional locations) SAP ERP system.
Owing to the described works aimed at the provision of access at PM objects to project design documentation, LUKOIL Mid-East Ltd. users were provided prompt access to up-to-date documentation and managed to reduce the time for finding project design documents required for the operation of production equipment.