RU EN

Development of design documentation for telecom and security systems to be installed at the Gas Turbine Power Plant at West Qurna-2 field, Iraq

Development of design documentation for telecom and security systems to be installed at the Gas Turbine Power Plant at West Qurna-2 field, Iraq

Industry

Design and installation of telecom and security systems

Service

  • Design documentation development
  • Equipment supplies for telecom networks and security systems
  • Designer supervision over equipment installation at construction site and startup and adjustment work.

Company

General Customer – LUKOIL Mid East Ltd. General Contractor – CAPITAL CITY INVESTMENT B.V., Enka Insaat ve Sanayi A.S. (Turkey)

Objective

Develop design documentation for telecom and security systems to be installed at the Gas Turbine Power Plant at West Qurna-2 field, Iraq

Ensure that equipment and materials needed for installing the designed systems are procured and delivered to the construction site.

Provide designer supervision over the installation of equipment and networks, take part in startup and adjustment work.

Implementation Description

Over the period from April 2013 to November 2013, working under contact for CAPITAL CITY INVESTMENT B.V. (a subsidiary of Enka Insaat ve Sanayi A. S. (Turkey)), specialists from ITPS developed and coordinated with General Customer a package of design documentation (101 documents) for the installation and launch of the following systems:

  1. TETRA RADIO SYSTEM
  2. TELEPHONE SYSTEM
  3. DATA LAN/WAN SYSTEM
  4. PUBLIC ADDRESS & GENERAL ALARM SYSTEM
  5. STRUCTURED CABLING SYSTEM
  6. VIDEO CONFERENCE SYSTEM
  7. PROCESS SURVEILLANCE & SECURITY CCTV SYSTEM
  8. ACCESS CONTROL SYSTEM

Equipment needed for the installation of the designed systems was procured from such world-leading companies as Motorola, Alcatel-Lucent, Vaisala, Cisco, HP, Industronic, Fujikura, Systimax, General Cable, Rittal, Bosch, LG, Denon, Epson, APC, Checkpoint, Juniper and Digi and delivered to the construction site from May 2013 to December 2013.

From November 2013 to August 2014, designer supervision over the equipment installation and startup and adjustment work at the construction site was provided for Enka Insaat ve Sanayi A.S. (Turkey).

Result

The developed design documentation and the high qualification of ITPS specialists ensured timely installation of necessary equipment, integration of the telecom and security systems installed at the Gas Turbine Power Plant with similar systems installed at other facilities within the field, testing, tuning and putting the installed systems into operation.

Client's comment

“During the installation of the systems, IT Professional Solutions Mid East FZ-LLC experts provided qualified technical services for installation, inspection, testing, commissioning and initial operation of the equipment, components and systems within the scope of the contract. All site acceptance test were completed without remarks.

During the performance of contractual work under the project, IT Professional Solutions Mid East FZ-LLC proved itself as a responsible contractor that performed its obligations in full and in scheduled time.

Hereby Enka Insaat ve Sanayi A.S. confirms expertise, efficiency, and responsibility of IT Professional Solutions Mid East FZ-LLC, its understanding of the Customer’s business processes, and recommends IT Professional Solutions Mid East FZ-LLC for EPC projects implementation”.

Department Procurement Manger, Tankut Bulut


Feedback on the Development of design documentation by ITPS Mid East for telecom and security systems to be installed at the Gas Turbine Power Plant at West Qurna-2 field, Iraq

Вы работаете в ИТ-службе или являетесь сотрудником ремонтного или сервисного подразделения службы главного инженера?

Примите участие в бесплатном семинаре «Управление ремонтами на базе SAP ТОРО в интеграции с системой ОПТИМУМ ММС»
25 мая в Москве!

Узнать подробности и зарегистрироваться